<?xml version="1.0" encoding="UTF-8"?><rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:wfw="http://wellformedweb.org/CommentAPI/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
	xmlns:slash="http://purl.org/rss/1.0/modules/slash/"
	>

<channel>
	<title>daryl Robinson Archives - Crestchic leading manufacturer of load banks</title>
	<atom:link href="https://loadbanks.com/tag/daryl-robinson/feed/" rel="self" type="application/rss+xml" />
	<link>https://loadbanks.com/tag/daryl-robinson/</link>
	<description></description>
	<lastBuildDate>Tue, 01 Aug 2023 12:22:18 +0000</lastBuildDate>
	<language>en-GB</language>
	<sy:updatePeriod>
	hourly	</sy:updatePeriod>
	<sy:updateFrequency>
	1	</sy:updateFrequency>
	<generator>https://wordpress.org/?v=6.9.4</generator>

<image>
	<url>https://i0.wp.com/loadbanks.com/wp-content/uploads/2022/06/cropped-crestchic_favicon-1.gif?fit=32%2C32&#038;ssl=1</url>
	<title>daryl Robinson Archives - Crestchic leading manufacturer of load banks</title>
	<link>https://loadbanks.com/tag/daryl-robinson/</link>
	<width>32</width>
	<height>32</height>
</image> 
<site xmlns="com-wordpress:feed-additions:1">204553752</site>	<item>
		<title>From engineering to sales: Isabella’s first three months</title>
		<link>https://loadbanks.com/from-engineering-to-sales-isabellas-first-three-months/</link>
		
		<dc:creator><![CDATA[Crestchic]]></dc:creator>
		<pubDate>Tue, 01 Aug 2023 12:22:18 +0000</pubDate>
				<category><![CDATA[News]]></category>
		<category><![CDATA[daryl Robinson]]></category>
		<category><![CDATA[engineering]]></category>
		<category><![CDATA[isabella]]></category>
		<category><![CDATA[load banks]]></category>
		<category><![CDATA[rental]]></category>
		<category><![CDATA[sales]]></category>
		<guid isPermaLink="false">https://loadbanks.com/?p=67432</guid>

					<description><![CDATA[<p>After more than four years in Engineering as the role of Electrical Design Engineer, Isabella Xu made the leap into a sales role in February 2023. In her new role, Isabella is working closely with Daryl Robinson to support sales activities in Africa, the Middle East and the Far East.  Daryl explains the decision to [&#8230;]</p>
<p>The post <a href="https://loadbanks.com/from-engineering-to-sales-isabellas-first-three-months/">From engineering to sales: Isabella’s first three months</a> appeared first on <a href="https://loadbanks.com">Crestchic leading manufacturer of load banks</a>.</p>
]]></description>
										<content:encoded><![CDATA[<p><span style="font-weight: 400;">After more than four years in Engineering as the role of Electrical Design Engineer, Isabella Xu made the leap into a sales role in February 2023. In her new role, Isabella is working closely with Daryl Robinson to support sales activities in Africa, the Middle East and the Far East. </span></p>
<p><span style="font-weight: 400;">Daryl explains the decision to persuade Isabella to join the sales team; “In her previous engineering role, Isabella was involved in all stages of the lifecycle of a load bank – from analysing technical documentation and specifications, undertaking electrical calculations of cable, power and fuse sizing and producing electrical schematics, controller coding and build instructions, through to making recommendations for product improvement and development. As such, she knows the product inside and out, and has a level of understanding that makes her a huge asset to the sales team.”</span></p>
<p><span style="font-weight: 400;">So how have the first three months in the role gone? Isabella’s first week was spent with five Indonesian customers and a London-based consultant, who wanted to witness a Crestchic 3MVA resistive reactive containerised load bank on full load, using the power from Aggreko Gensets. All went really well, and the load bank was air freighted to Jakarta 2 weeks later.</span></p>
<p><span style="font-weight: 400;">Two weeks later, Isabella was an integral part of the team hosting the Crestchic stand and meeting customers and prospects at the Middle East Energy exhibition, in Dubai. This was the true baptism of fire for Isabella! </span></p>
<p><span style="font-weight: 400;">Daryl explains: “The show is always a busy one, so Isabella was unsure what to expect! </span></p>
<p><span style="font-weight: 400;">As soon as the team arrived at the exhibition stand we were overwhelmed with visitors and it was all hands on deck chatting to customers. The expo was the busiest I had ever attended, with nearly 140 enquiries received on the stand. Isabella had no time for doubts and got on with the talking!”</span></p>
<p><span style="font-weight: 400;">Back in the office Isabella is quoting load banks from 100kW up to multi-MVA projects around the world and says she has never had so many emails! She is also looking forward to the Enlit exhibition, which takes place in November in Jakarta. </span></p>
<p><span style="font-weight: 400;">Well done Isabella, it sounds like you have really hit the ground running! </span></p>
<p>The post <a href="https://loadbanks.com/from-engineering-to-sales-isabellas-first-three-months/">From engineering to sales: Isabella’s first three months</a> appeared first on <a href="https://loadbanks.com">Crestchic leading manufacturer of load banks</a>.</p>
]]></content:encoded>
					
		
		
		<post-id xmlns="com-wordpress:feed-additions:1">67432</post-id>	</item>
	</channel>
</rss>
