<?xml version="1.0" encoding="UTF-8"?><rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:wfw="http://wellformedweb.org/CommentAPI/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
	xmlns:slash="http://purl.org/rss/1.0/modules/slash/"
	>

<channel>
	<title>datacentre Archives - Crestchic leading manufacturer of load banks</title>
	<atom:link href="https://loadbanks.com/tag/datacentre/feed/" rel="self" type="application/rss+xml" />
	<link>https://loadbanks.com/tag/datacentre/</link>
	<description>The Loadbank Experts</description>
	<lastBuildDate>Tue, 03 Mar 2026 22:15:40 +0000</lastBuildDate>
	<language>en-GB</language>
	<sy:updatePeriod>
	hourly	</sy:updatePeriod>
	<sy:updateFrequency>
	1	</sy:updateFrequency>
	<generator>https://wordpress.org/?v=7.1.3</generator>

<image>
	<url>https://i0.wp.com/loadbanks.com/wp-content/uploads/2022/06/cropped-crestchic_favicon-1.gif?fit=32%2C32&#038;ssl=1</url>
	<title>datacentre Archives - Crestchic leading manufacturer of load banks</title>
	<link>https://loadbanks.com/tag/datacentre/</link>
	<width>32</width>
	<height>32</height>
</image> 
<site xmlns="com-wordpress:feed-additions:1">204553752</site>	<item>
		<title>Crestchic Unveils 600kW Liquid Cooled Loadbank at Data Centre World, London</title>
		<link>https://loadbanks.com/crestchic-unveils-600kw-liquid-cooled-loadbank-at-data-centre-world-london/</link>
		
		<dc:creator><![CDATA[Crestchic]]></dc:creator>
		<pubDate>Wed, 04 Mar 2026 08:00:39 +0000</pubDate>
				<category><![CDATA[News]]></category>
		<category><![CDATA[600kW]]></category>
		<category><![CDATA[datacentre]]></category>
		<category><![CDATA[liquid cooled]]></category>
		<guid isPermaLink="false">https://loadbanks.com/?p=71884</guid>

					<description><![CDATA[<p>Setting a new standard in high-density data centre commissioning  Crestchic, the world&#8217;s leading provider of load bank solutions, today announced the launch of its innovative 600kW Liquid Cooled Loadbank at Data Centre World, London. The product marks a significant advancement in commissioning technology for the rapidly expanding liquid-cooled data centre market.  As rack power densities continue to [&#8230;]</p>
<p>The post <a href="https://loadbanks.com/crestchic-unveils-600kw-liquid-cooled-loadbank-at-data-centre-world-london/">Crestchic Unveils 600kW Liquid Cooled Loadbank at Data Centre World, London</a> appeared first on <a href="https://loadbanks.com">Crestchic leading manufacturer of load banks</a>.</p>
]]></description>
										<content:encoded><![CDATA[<p><span data-contrast="none">Setting a new standard in high-density data centre commissioning</span><span data-ccp-props="{&quot;134245418&quot;:false,&quot;134245529&quot;:false,&quot;201341983&quot;:0,&quot;335559739&quot;:80,&quot;335559740&quot;:360}"> </span></p>
<p><span data-contrast="auto">Crestchic, the world&#8217;s leading provider of load bank solutions, today announced the launch of its innovative 600kW Liquid Cooled Loadbank at Data Centre World, London. The product marks a significant advancement in commissioning technology for the rapidly expanding liquid-cooled data centre market.</span><span data-ccp-props="{&quot;201341983&quot;:0,&quot;335559739&quot;:80,&quot;335559740&quot;:360}"> </span></p>
<p><span data-contrast="auto">As rack power densities continue to rise, operators are increasingly deploying liquid cooling technologies to manage thermal loads more efficiently. The need for precision commissioning tools has never been greater. Crestchic&#8217;s new 600kW Liquid Cooled Loadbank has been purpose-built to meet this challenge, delivering accurate thermal validation and precision electrical testing of liquid-cooled infrastructure at scale.</span><span data-ccp-props="{&quot;201341983&quot;:0,&quot;335559739&quot;:80,&quot;335559740&quot;:360}"> </span></p>
<p aria-level="2"><span data-contrast="auto">Purpose-built for the modern data centre</span><span data-ccp-props="{&quot;134245418&quot;:true,&quot;134245529&quot;:true,&quot;201341983&quot;:0,&quot;335559738&quot;:360,&quot;335559739&quot;:80,&quot;335559740&quot;:360}"> </span></p>
<p><span data-contrast="auto">The 600kW Loadbank delivers up to 648kW at 415V and has been engineered for the rigours of real-world data centre commissioning. </span><span data-ccp-props="{&quot;201341983&quot;:0,&quot;335559738&quot;:280,&quot;335559739&quot;:280,&quot;335559740&quot;:360}"> </span></p>
<p><span data-contrast="auto">At the heart of the new platform is stable ΔT thermal control to ±0.5°C, enabling highly repeatable validation and precision electrical testing of liquid-cooled infrastructure. The unit maintains temperature accuracy to ±0.5°C regardless of flow variation, giving engineers the repeatability and confidence they need during critical testing activities. Comprehensive system protection covers flow, pressure, overload/underload, and thermal shock, safeguarding both the load bank and the infrastructure it is connected to.</span><span data-ccp-props="{&quot;201341983&quot;:0,&quot;335559738&quot;:280,&quot;335559739&quot;:280,&quot;335559740&quot;:360}"> </span></p>
<p><span data-contrast="auto">The 600kW platform features a single-vessel architecture, eliminating the need for multi-vessel configurations typically used at this power level. The result is a significantly smaller footprint, making the unit easier to position in space-constrained plant rooms. The compact design also simplifies transport, storage, and on-site handling. With a stackable structure, flush-mounted connections, heavy-duty castors and dual-side forklift pockets, the unit has been engineered for practical deployment on live project sites and can transported double stacked within a standard height ISO shipping container. </span><span data-ccp-props="{&quot;201341983&quot;:0,&quot;335559738&quot;:280,&quot;335559739&quot;:280,&quot;335559740&quot;:360}"> </span></p>
<p aria-level="2"><span data-contrast="auto">Advanced control and reporting with VCS</span><span data-ccp-props="{&quot;134245418&quot;:true,&quot;134245529&quot;:true,&quot;201341983&quot;:0,&quot;335559738&quot;:360,&quot;335559739&quot;:80,&quot;335559740&quot;:360}"> </span></p>
<p><span data-contrast="auto">The 600kW platform integrates with Crestchic&#8217;s state-of-the-art VCS software, providing a comprehensive digital dashboard with live supply and hydraulic instrumentation data. The software supports real-time monitoring, automatic load profiling and clustering of up to 240 load banks for hybrid air-cooled and liquid-cooled test configurations. Automated compliance reporting via the Crestchic Portal provides audit-ready documentation aligned with key industry standards including ISO 8528-5/22514, NEMA MG1, EN60150, IEEE 141 and ASHRAE G22 standards.</span><span data-ccp-props="{&quot;201341983&quot;:0,&quot;335559739&quot;:80,&quot;335559740&quot;:360}"> </span></p>
<p><span data-contrast="auto">“The move toward liquid cooling is accelerating as rack densities increase, particularly with AI and high-performance computing workloads,” explains Paul Brickman, Commercial Director at Crestchic. “Our new 600kW Liquid Cooled Loadbank has been designed from the ground up to serve this market, giving commissioning engineers the precision, reliability and control they need to bring critical infrastructure online with confidence.&#8221;</span><span data-ccp-props="{&quot;201341983&quot;:0,&quot;335559739&quot;:80,&quot;335559740&quot;:360}"> </span></p>
<p><span data-contrast="auto">The 600kW Liquid Cooled Loadbank is available for both sale and rental through Crestchic&#8217;s global network of offices across the UK, Ireland, Singapore, Germany, Belgium, France, China, and UAE.</span><span data-ccp-props="{&quot;201341983&quot;:0,&quot;335559739&quot;:80,&quot;335559740&quot;:360}"> </span></p>
<p aria-level="2"><span data-contrast="auto">About Crestchic</span><span data-ccp-props="{&quot;134245418&quot;:true,&quot;134245529&quot;:true,&quot;201341983&quot;:0,&quot;335559738&quot;:360,&quot;335559739&quot;:80,&quot;335559740&quot;:360}"> </span></p>
<p><span data-contrast="auto">Crestchic is a world-leading manufacturer and provider of load bank solutions, with decades of experience supporting the power generation, data centre, marine and defence industries. For more information, visit www.crestchicloadbanks.com</span><span data-ccp-props="{&quot;201341983&quot;:0,&quot;335559739&quot;:80,&quot;335559740&quot;:360}"> </span></p>
<p><span data-contrast="auto">Media Enquiries: Laura Wilks |  l.wilks@crestchic.com | 07828953758</span><span data-ccp-props="{&quot;201341983&quot;:0,&quot;335559739&quot;:80,&quot;335559740&quot;:360}"> </span></p>
<p><b><span data-contrast="auto">Ends</span></b><span data-ccp-props="{&quot;201341983&quot;:0,&quot;335559739&quot;:80,&quot;335559740&quot;:360}"> </span></p>
<p>The post <a href="https://loadbanks.com/crestchic-unveils-600kw-liquid-cooled-loadbank-at-data-centre-world-london/">Crestchic Unveils 600kW Liquid Cooled Loadbank at Data Centre World, London</a> appeared first on <a href="https://loadbanks.com">Crestchic leading manufacturer of load banks</a>.</p>
]]></content:encoded>
					
		
		
		<post-id xmlns="com-wordpress:feed-additions:1">71884</post-id>	</item>
		<item>
		<title>What is Integrated Systems Testing in a Data Centre Environment?</title>
		<link>https://loadbanks.com/what-is-integrated-systems-testing-in-a-data-centre-environment/</link>
		
		<dc:creator><![CDATA[Crestchic]]></dc:creator>
		<pubDate>Mon, 11 Nov 2024 13:33:50 +0000</pubDate>
				<category><![CDATA[News]]></category>
		<category><![CDATA[200kW]]></category>
		<category><![CDATA[datacentre]]></category>
		<category><![CDATA[heat load testing]]></category>
		<category><![CDATA[ist]]></category>
		<category><![CDATA[loadtesting]]></category>
		<category><![CDATA[testing]]></category>
		<guid isPermaLink="false">https://loadbanks.com/?p=70641</guid>

					<description><![CDATA[<p>Integrated Systems Testing: Modern data centres support crucial infrastructure for businesses, governments, and institutions. As such, uninterrupted service is essential. Integrated Systems Tests (ISTs) are critical for ensuring the reliability, resilience, and continuity of operations in an environment where even a few seconds of downtime can have significant consequences. Meticulously designed, data centres must be [&#8230;]</p>
<p>The post <a href="https://loadbanks.com/what-is-integrated-systems-testing-in-a-data-centre-environment/">What is Integrated Systems Testing in a Data Centre Environment?</a> appeared first on <a href="https://loadbanks.com">Crestchic leading manufacturer of load banks</a>.</p>
]]></description>
										<content:encoded><![CDATA[<p><span style="font-weight: 400;">Integrated Systems Testing: Modern data centres support crucial infrastructure for businesses, governments, and institutions. As such, uninterrupted service is essential. Integrated Systems Tests (ISTs) are critical for ensuring the reliability, resilience, and continuity of operations in an environment where even a few seconds of downtime can have significant consequences.</span></p>
<p><span style="font-weight: 400;">Meticulously designed, data centres must be able to store, process, and distribute vast amounts of data, 24 hours a day, 7 days a week. To meet this relentless demand for uninterrupted service data centres combine advanced engineering, architecture, and cutting-edge technology. </span></p>
<p><span style="font-weight: 400;">Using comprehensive testing and evaluation, IST ensures that all critical systems work seamlessly together. These tests are conducted after individual systems (like power, cooling, network, and security) have been installed and tested independently. </span></p>
<h1><span style="font-weight: 400;">Why are Integrated Systems Tests important? </span></h1>
<p><span style="font-weight: 400;">Tests integrate all critical equipment and systems, conducting rigorous assessments to evaluate and verify functionality, interoperability, and response to simulated failure scenarios. By testing power distribution systems and cooling systems, commissioning managers can verify that systems and components meet specified performance criteria. </span></p>
<h4><span style="font-weight: 400;">This includes: </span></h4>
<ul>
<li style="font-weight: 400;" aria-level="1"><b>Verify interoperability:</b><span style="font-weight: 400;"> Ensure that systems like power distribution systems, Uninterruptible Power Supplies (UPS), generators, cooling systems, and fire suppression systems work in harmony.</span></li>
<li style="font-weight: 400;" aria-level="1"><b>Assess resilience and reduce risk: </b><span style="font-weight: 400;">Testing allows operators to simulate events such as power outages, equipment failures, and cooling loss to verify that the data centre can continue to operate under these conditions. The tests can also check if backup power systems activate as intended to prevent downtime.</span></li>
<li style="font-weight: 400;" aria-level="1"><b>Safety and compliance:</b><span style="font-weight: 400;"> Testing can help to validate that emergency protocols are effective and meet industry regulations, standards and best practices. </span></li>
<li style="font-weight: 400;" aria-level="1"><b>Performance of electrical systems: </b><span style="font-weight: 400;">Testing allows operators to confirm that the data centre can handle maximum load requirements and ensure that systems like power and cooling can support this load.</span></li>
</ul>
<h1><span style="font-weight: 400;">What do IST tests cover? </span></h1>
<p><span style="font-weight: 400;">The Uptime Institute states: “Rigorous, comprehensive commissioning reduces initial failure rates, ensures that the data centre functions as designed, and verifies facility operations capabilities—setting up Operations for success.”</span></p>
<p><span style="font-weight: 400;">Generally, five levels of testing form the overall process of commissioning a data centre: </span></p>
<ul>
<li style="font-weight: 400;" aria-level="1"><span style="font-weight: 400;">Level 1: Factory Testing,</span></li>
<li style="font-weight: 400;" aria-level="1"><span style="font-weight: 400;">Level 2: Site acceptance inspection </span></li>
<li style="font-weight: 400;" aria-level="1"><span style="font-weight: 400;">Level 3: Pre-functional testing </span></li>
<li style="font-weight: 400;" aria-level="1"><span style="font-weight: 400;">Level 4: Functional Testing,</span></li>
<li style="font-weight: 400;" aria-level="1"><span style="font-weight: 400;">Level 5: Integrated System Testing</span></li>
</ul>
<p><span style="font-weight: 400;">The below table, from the Uptime Institute, outlines what is covered in each step: </span></p>
<p><img data-recalc-dims="1" fetchpriority="high" decoding="async" class="alignleft size-full wp-image-70648" src="https://i0.wp.com/loadbanks.com/wp-content/uploads/2024/11/Datacentre-IST-Blog-Post-table-from-UI.jpg?resize=1080%2C1344&#038;ssl=1" alt="IST Data Centres" width="1080" height="1344" srcset="https://loadbanks.com/wp-content/uploads/2024/11/Datacentre-IST-Blog-Post-table-from-UI.jpg 1500w, https://loadbanks.com/wp-content/uploads/2024/11/Datacentre-IST-Blog-Post-table-from-UI-1280x1593.jpg 1280w, https://loadbanks.com/wp-content/uploads/2024/11/Datacentre-IST-Blog-Post-table-from-UI-980x1220.jpg 980w, https://loadbanks.com/wp-content/uploads/2024/11/Datacentre-IST-Blog-Post-table-from-UI-480x597.jpg 480w" sizes="((min-width: 0px) and (max-width: 480px)) 480px, ((min-width: 481px) and (max-width: 980px)) 980px, ((min-width: 981px) and (max-width: 1280px)) 1280px, (min-width: 1281px) 1500px, 100vw" /></p>
<p><span style="font-weight: 400;">Level five testing, or integrated systems testing, covers several key areas to ensure reliable and resilient operations. Power systems, including backup generators, UPS systems, power distribution units, and batteries, are tested to confirm they can maintain uninterrupted power.</span></p>
<p><span style="font-weight: 400;">Cooling systems are verified to ensure they keep temperatures stable even under heavy loads &#8211; a vital step for server rooms that exude huge amounts of heat under normal operation. Tests also cover networking infrastructure and fire suppression and security systems. Together, these tests provide a comprehensive view of the data centre’s readiness to handle real-world demands and potential emergencies.</span></p>
<h1><span style="font-weight: 400;">What are the benefits of running an IST?</span></h1>
<p><b>Prevent unplanned downtime: </b><span style="font-weight: 400;">Modern data centres must operate 24/7.  ISTs can identify weaknesses that might lead to failures during normal operation.</span></p>
<p><b>Operational readiness:</b><span style="font-weight: 400;"> Ensures the data centre can meet strict Service Level Agreements (SLAs) with minimal risk of failure.</span></p>
<p><b>Improved efficiency: </b><span style="font-weight: 400;">Helps to identify areas for operational optimisation, like load balancing in power or cooling systems.</span></p>
<p><span style="font-weight: 400;">In summary, ISTs are critical because they validate that systems have been designed and commissioned correctly to keep the environment stable, safe, and online—even under stress. This holistic testing approach is critical to minimising risk and maximising reliability in a setting where uptime is everything.</span></p>
<p><b>Find out how our 200kW data centre loadbank can help make IST tests more efficient and accurate. <a href="https://loadbanks.com/contact-us/">Speak to our team now</a>. </b></p>
<p>The post <a href="https://loadbanks.com/what-is-integrated-systems-testing-in-a-data-centre-environment/">What is Integrated Systems Testing in a Data Centre Environment?</a> appeared first on <a href="https://loadbanks.com">Crestchic leading manufacturer of load banks</a>.</p>
]]></content:encoded>
					
		
		
		<post-id xmlns="com-wordpress:feed-additions:1">70641</post-id>	</item>
		<item>
		<title>Crestchic to Showcase Loadbank Solutions at Data Centre World Singapore</title>
		<link>https://loadbanks.com/crestchic-to-showcase-loadbank-solutions-at-data-centre-world-singapore/</link>
		
		<dc:creator><![CDATA[Crestchic]]></dc:creator>
		<pubDate>Mon, 09 Oct 2023 13:32:31 +0000</pubDate>
				<category><![CDATA[News]]></category>
		<category><![CDATA[data centre world]]></category>
		<category><![CDATA[datacentre]]></category>
		<category><![CDATA[dcw singapore]]></category>
		<category><![CDATA[exhibition]]></category>
		<category><![CDATA[loadbanks]]></category>
		<category><![CDATA[singapore]]></category>
		<guid isPermaLink="false">https://loadbanks.com/?p=67882</guid>

					<description><![CDATA[<p>Crestchic Loadbanks, a global leader in load testing solutions, is excited to announce its participation at this week’s Data Centre World Event 2023, which takes place October 11th to 12th, 2023, at the prestigious Marina Bay Sands in Singapore.  Paul Brickman, Commercial Director at Crestchic Loadbanks, commented: “As the demand for reliable data centre infrastructure [&#8230;]</p>
<p>The post <a href="https://loadbanks.com/crestchic-to-showcase-loadbank-solutions-at-data-centre-world-singapore/">Crestchic to Showcase Loadbank Solutions at Data Centre World Singapore</a> appeared first on <a href="https://loadbanks.com">Crestchic leading manufacturer of load banks</a>.</p>
]]></description>
										<content:encoded><![CDATA[<p><span style="font-weight: 400;">Crestchic Loadbanks, a global leader in load testing solutions, is excited to announce its participation at this week’s Data Centre World Event 2023, which takes place October 11th to 12th, 2023, at the prestigious Marina Bay Sands in Singapore. </span></p>
<p><span style="font-weight: 400;">Paul Brickman, Commercial Director at Crestchic Loadbanks, commented: “As the demand for reliable data centre infrastructure continues to grow, Crestchic is dedicated to delivering advanced load-testing solutions that ensure the uninterrupted performance of critical power systems. The Data Centre World Event offers the perfect platform for Crestchic to showcase its latest innovations and engage with professionals from the data centre industry.”</span></p>
<p><span style="font-weight: 400;">Visitors to the Crestchic stand (</span><b>R65</b><span style="font-weight: 400;">) can gain insights from the company&#8217;s team of experts who will be available to answer questions, provide product information, and offer recommendations tailored to specific data centre requirements.</span></p>
<ul>
<li style="font-weight: 400;" aria-level="1"><span style="font-weight: 400;">Crestchic Loadbanks will showcase its comprehensive range of loadbank solutions designed to meet the diverse needs of data centres, from small-scale testing to large, complex installations.</span></li>
<li style="font-weight: 400;" aria-level="1"><span style="font-weight: 400;">The team will be available for discussions on power resilience strategies and how load testing can play a pivotal role in safeguarding data centre operations during power outages or emergencies.</span></li>
<li style="font-weight: 400;" aria-level="1"><span style="font-weight: 400;">Crestchic Loadbanks experts will be on hand to provide insights into best practices for generator testing, ensuring data centre operators have complete confidence in their backup power systems.</span></li>
<li style="font-weight: 400;" aria-level="1"><span style="font-weight: 400;">Learn about Crestchic Loadbanks&#8217; bespoke solutions, including trailerised loadbanks for multi-generator sites and loadbanks for heat load testing. </span></li>
</ul>
<p>Founded in 1983, Crestchic is one of the world’s leading specialist manufacturers of loadbanks which are used in the testing of power supplies in the most demanding climactic and environmental conditions across seven continents. Operating from locations in the UK, <a href="https://crestchic-usa.com">North America</a>, Singapore, <a href="https://crestchic.fr">France</a>, <a href="https://crestchic.de">Germany</a>, and the Middle East, the company is at the forefront of innovation and design, with thriving sales and rental operations and a loyal and growing customer base worldwide.</p>
<p>The post <a href="https://loadbanks.com/crestchic-to-showcase-loadbank-solutions-at-data-centre-world-singapore/">Crestchic to Showcase Loadbank Solutions at Data Centre World Singapore</a> appeared first on <a href="https://loadbanks.com">Crestchic leading manufacturer of load banks</a>.</p>
]]></content:encoded>
					
		
		
		<post-id xmlns="com-wordpress:feed-additions:1">67882</post-id>	</item>
		<item>
		<title>Leading data centre engineers specify Crestchic loadbank for mission-critical testing</title>
		<link>https://loadbanks.com/leading-data-centre-engineers-specify-crestchic-loadbank-for-mission-critical-testing/</link>
		
		<dc:creator><![CDATA[Crestchic]]></dc:creator>
		<pubDate>Fri, 16 Jun 2023 10:13:34 +0000</pubDate>
				<category><![CDATA[News]]></category>
		<category><![CDATA[data centre testing]]></category>
		<category><![CDATA[datacentre]]></category>
		<category><![CDATA[heat load]]></category>
		<category><![CDATA[load bank]]></category>
		<category><![CDATA[rental]]></category>
		<category><![CDATA[sale]]></category>
		<category><![CDATA[usa]]></category>
		<guid isPermaLink="false">https://loadbanks.com/?p=67164</guid>

					<description><![CDATA[<p>Data Centre Testing: For organizations that specialize in the design, engineering, construction and operation of data centres and other mission-critical facilities, meeting uptime requirements is key to success. Increasingly strict SLAs in data centres necessitate comprehensive testing of their infrastructure before they go live, including heat load testing in the server hall. To meet this [&#8230;]</p>
<p>The post <a href="https://loadbanks.com/leading-data-centre-engineers-specify-crestchic-loadbank-for-mission-critical-testing/">Leading data centre engineers specify Crestchic loadbank for mission-critical testing</a> appeared first on <a href="https://loadbanks.com">Crestchic leading manufacturer of load banks</a>.</p>
]]></description>
										<content:encoded><![CDATA[<p><span style="font-weight: 400;">Data Centre Testing: For organizations that specialize in the design, engineering, construction and operation of data centres and other mission-critical facilities, meeting uptime requirements is key to success. Increasingly strict SLAs in data centres necessitate comprehensive testing of their infrastructure before they go live, including heat load testing in the server hall. To meet this need, Crestchic USA’s Texas branch was approached by a leading provider in the planning, design, development, and operation of data centres.</span></p>
<p><b>The importance of heat load testing </b></p>
<p><span style="font-weight: 400;">Data Centre servers exude enormous amounts of heat; making it vital that air conditioning systems can cope with the heat output of the servers. Data centre heat load testing is a process of assessing the performance and capacity of a data centre&#8217;s cooling infrastructure by using a load bank to simulate the heat generated by IT equipment.</span></p>
<p><b>End-to-end load bank rental</b></p>
<p><span style="font-weight: 400;">Steven Bacon, Business Development Manager at Crestchic USA, explains, “Heat load testing is a critical step in the design and commissioning of any data center. Failing to heat load test the server hall can result in inadequate cooling, </span><span style="font-weight: 400;">which can impact the performance and reliability of the IT equipment. Higher temperatures can lead to thermal throttling, reduced processing speeds, increased error rates, and overall degradation in system performance. By using a load bank </span><span style="font-weight: 400;">to simulate the heat output of the servers, we are able to subject the cooling systems to different heat loads to ensure they can effectively dissipate the generated heat and maintain optimal operating temperatures.</span><span style="font-weight: 400;">”</span></p>
<p><b>Load-testing solutions for maximum uptime</b></p>
<p><span style="font-weight: 400;">To fulfill this need, the Crestchic team conducted a survey of the data centre site and specified a 255KW load bank. The agreed rental package included a full Risk Assessment and Method Statement, dedicated transport for delivery, as well as fully trained installers and engineers to set up the load banks, perform final electrical connections in line with local regulations, and offer customer training and support. </span></p>
<p><span style="font-weight: 400;">Using the load banks, the customer was able to</span><span style="font-weight: 400;"> validate the capacity of the cooling infrastructure, helping to prevent overheating issues that could lead to equipment failures and service disruptions. To find out more about Crestchic’s load testing solutions for the data center sector, including heat load testing, bus bar testing, generator testing and more, <a href="https://loadbanks.com/wp-content/uploads/2021/09/Data-Centre-Guide-Series-V1.pdf">please </a></span><span style="font-weight: 400;"><a href="https://loadbanks.com/wp-content/uploads/2021/09/Data-Centre-Guide-Series-V1.pdf">download our data centre guide</a>. </span></p>
<p>The post <a href="https://loadbanks.com/leading-data-centre-engineers-specify-crestchic-loadbank-for-mission-critical-testing/">Leading data centre engineers specify Crestchic loadbank for mission-critical testing</a> appeared first on <a href="https://loadbanks.com">Crestchic leading manufacturer of load banks</a>.</p>
]]></content:encoded>
					
		
		
		<post-id xmlns="com-wordpress:feed-additions:1">67164</post-id>	</item>
		<item>
		<title>Data Center World Build Conference: My five top takeaways  </title>
		<link>https://loadbanks.com/data-center-world-build-conference-my-five-top-takeaways/</link>
		
		<dc:creator><![CDATA[Crestchic]]></dc:creator>
		<pubDate>Wed, 31 May 2023 15:49:01 +0000</pubDate>
				<category><![CDATA[News]]></category>
		<category><![CDATA[data center]]></category>
		<category><![CDATA[data centre]]></category>
		<category><![CDATA[datacenter]]></category>
		<category><![CDATA[datacentre]]></category>
		<category><![CDATA[load banks]]></category>
		<category><![CDATA[load testing]]></category>
		<category><![CDATA[rental]]></category>
		<category><![CDATA[steven bacon]]></category>
		<category><![CDATA[texas]]></category>
		<category><![CDATA[usa]]></category>
		<guid isPermaLink="false">https://loadbanks.com/?p=67002</guid>

					<description><![CDATA[<p>In May 2023, Crestchic participated in the first-ever Data Center World Build Conference in Austin, TX. Steven Bacon, Business Development Manager at Crestchic, shares his five top takeaways from the event.  Efficiency is key: During the two-day conference, there was a lot of talk about efficiency in the data center sector. Many of our customers [&#8230;]</p>
<p>The post <a href="https://loadbanks.com/data-center-world-build-conference-my-five-top-takeaways/">Data Center World Build Conference: My five top takeaways  </a> appeared first on <a href="https://loadbanks.com">Crestchic leading manufacturer of load banks</a>.</p>
]]></description>
										<content:encoded><![CDATA[<p><span style="font-weight: 400;">In May 2023, Crestchic participated in the first-ever Data Center World Build Conference in Austin, TX. Steven Bacon, Business Development Manager at Crestchic, shares his five top takeaways from the event. </span></p>
<p><b>Efficiency is key:</b><span style="font-weight: 400;"> During the two-day conference, there was a lot of talk about efficiency in the data center sector. Many of our customers and prospects want to do testing promptly, making rental turnaround a key driver in selecting a provider. </span></p>
<p><b>Labour shortages are an ongoing issue:</b><span style="font-weight: 400;"> Many data centres do not have the right labour pool to execute daily operations, let alone testing. This means that having access to trained technicians is an important factor when selecting a solution provider. </span></p>
<p><b>Heat load testing is as important as genset testing: </b><span style="font-weight: 400;">Most facilities managers and data center operators are aware of the need to test generators to keep backup power running efficiently. Speaking to customers and prospects, it would seem that there is an increased interest in using load bank solutions to heat load test server halls at the commissioning phase. </span></p>
<p><b>Backup power lead times are long:</b><span style="font-weight: 400;"> In some cases, lead times for generators are up to two years. This means that data centers must invest in backup power solutions early in the planning and commissioning phase. To avoid this, some data centers rent generators. While this is a temporary solution, rental generators are often older, making it vital that load testing is completed frequently. </span></p>
<p><b>De-risking data centers is high on the agenda:</b><span style="font-weight: 400;"> From my many conversations with customers, I heard them speak about de-risking their data center. Some load banked their data centers monthly; others only did it when their generator services company scheduled it. The overwhelming sentiment was that they want to test more often and efficiently to avoid the risk of outages. </span></p>
<p><span style="font-weight: 400;">To find out more about how Crestchic can help to address these issues, speak to our rental team <a href="https://loadbanks.com/contact-us/">here</a>. </span></p>
<p>The post <a href="https://loadbanks.com/data-center-world-build-conference-my-five-top-takeaways/">Data Center World Build Conference: My five top takeaways  </a> appeared first on <a href="https://loadbanks.com">Crestchic leading manufacturer of load banks</a>.</p>
]]></content:encoded>
					
		
		
		<post-id xmlns="com-wordpress:feed-additions:1">67002</post-id>	</item>
		<item>
		<title>FUTUREPROOFING LOAD BANK UPGRADES FOR ONE OF GERMANY’S LARGEST DATA CENTRES</title>
		<link>https://loadbanks.com/germany-datacentre-futureproofing-load-bank-upgrades-for-one-of-germanys-largest-data-centres/</link>
		
		<dc:creator><![CDATA[Crestchic]]></dc:creator>
		<pubDate>Wed, 17 May 2023 13:35:26 +0000</pubDate>
				<category><![CDATA[News]]></category>
		<category><![CDATA[control]]></category>
		<category><![CDATA[datacentre]]></category>
		<category><![CDATA[germany]]></category>
		<category><![CDATA[loadbanks]]></category>
		<category><![CDATA[NOVA]]></category>
		<guid isPermaLink="false">https://loadbanks.com/?p=66912</guid>

					<description><![CDATA[<p>Germany Datacentre: Crestchic has delivered essential upgrades to the load bank controller system for one of Germany’s largest data centres. Due to advancements in microprocessor technology, components for the site’s Eclipse 3.1 load bank control system were becoming obsolete, leaving the campus vulnerable to power testing failures. To prevent this, and to improve overall testing [&#8230;]</p>
<p>The post <a href="https://loadbanks.com/germany-datacentre-futureproofing-load-bank-upgrades-for-one-of-germanys-largest-data-centres/">FUTUREPROOFING LOAD BANK UPGRADES FOR ONE OF GERMANY’S LARGEST DATA CENTRES</a> appeared first on <a href="https://loadbanks.com">Crestchic leading manufacturer of load banks</a>.</p>
]]></description>
										<content:encoded><![CDATA[<p>Germany Datacentre: Crestchic has delivered essential upgrades to the load bank controller system for one of Germany’s largest data centres.</p>
<p>Due to advancements in microprocessor technology, components for the site’s Eclipse 3.1 load bank control system were becoming obsolete, leaving the campus vulnerable to power testing failures. To prevent this, and to improve overall testing performance, Crestchic upgraded the control system to its latest NOVA hardware, alongside the installation of a new emergency stop system, fibre connectivity, and a rugged LC80 tablet control.</p>
<p>Steven Jewell, Service Engineer for Crestchic, comments on the essential upgrades:</p>
<p>“This data centre offers 11,700 m<sup>2 </sup>of server space and has a maximum IT load of 17.1 MW. That amount of power needs a substantial and well-tested backup solution to prevent financially crippling downtime.</p>
<p>“The loadbank at this site is used to test the backup power system in a way that is robust and proactive to mitigate the risk of failure. When the customer learned that their control system was becoming harder to maintain and repair due to legacy components, they scheduled an upgrade to the latest controller technology without hesitation.”</p>
<p><strong>Installing the NOVA controller technology</strong></p>
<p>Not only does the NOVA controller technology meet the latest microprocessor technology standards, it also enables additional operational and performance benefits such as the installation of fibre connectivity and the introduction of the LC80 tablet.</p>
<p><u>A large operating interface display</u></p>
<p>As part of this data centre’s NOVA upgrade, the team opted for a rugged IP65, LC80 tablet that offers a large operating interface display. From here, data and frequency response curves can be clearly observed and engineers can access a range of advanced features such as a graphical display of transient performance at load change, recording of instrumentation data, and storage of multi-user-defined load-profiles.</p>
<p><img data-recalc-dims="1" decoding="async" class="alignleft size-medium wp-image-66913" src="https://i0.wp.com/loadbanks.com/wp-content/uploads/2023/05/New-Nova-Control-System.jpg?resize=225%2C300&#038;ssl=1" alt="Germany datacentre" width="225" height="300" /></p>
<p><u>Fast, interference-free fibre-optic communications</u></p>
<p>During these upgrades, the Crestchic team installed high-speed fibre optic cables back to the data centre’s building management system (BMS), delivering far faster data transfer capabilities.</p>
<p>With long distances of up to 500m possible without the need for signal boosting, and total immunity to electrical noise interference, Crestchic’s fibre control is a natural choice for demanding data centre environments.</p>
<p>Steven concludes: “With the upgrade works to the load bank control system complete, the data centre operator can now continue with its regular generator testing, safe in the knowledge that they have state-of-the-art technology at their fingertips.</p>
<p>“Crestchic is proactive in recommending system upgrades to its customers whenever technology becomes obsolete, or components become hard to source. This way, we can prevent downtime and help keep our customer’s sites working smoothly.”</p>
<p><strong>Backup power testing best practice for data centres</strong></p>
<p>A robust and proactive approach to the maintenance and testing of the power system is crucial to alleviate the chance of failure. However &#8211; it is vital that this doesn’t become a tick-box exercise &#8211; implementing a testing regime which validates the reliability and performance of backup power must be done under the types of loads found in real operational conditions. With this in mind, what would be considered best practice for testing a backup power system?</p>
<p>Ideally, all generators should be tested annually for real-world emergency conditions using a resistive-reactive 0.8pf load bank. Best practice dictates that all gensets (where there are multiple) should be run in a synchronised state, ideally for 8 hours but for a minimum of 3.</p>
<p>Where a reactive-only load bank is used, testing should be increased to 2-4 times per year at 3 hours per test. In carrying out this testing and maintenance, fuel, exhaust and cooling systems and alternator insulation resistance are effectively tested and system issues can be uncovered in a safe, controlled manner without the cost of major failure or unplanned downtime.</p>
<p>For more information, contact Crestchic on +44 (0)1283 531 645 or complete the <a href="https://loadbanks.com/contact-us/">online contact form</a>.</p>
<p>The post <a href="https://loadbanks.com/germany-datacentre-futureproofing-load-bank-upgrades-for-one-of-germanys-largest-data-centres/">FUTUREPROOFING LOAD BANK UPGRADES FOR ONE OF GERMANY’S LARGEST DATA CENTRES</a> appeared first on <a href="https://loadbanks.com">Crestchic leading manufacturer of load banks</a>.</p>
]]></content:encoded>
					
		
		
		<post-id xmlns="com-wordpress:feed-additions:1">66912</post-id>	</item>
		<item>
		<title>Crestchic Loadbanks to exhibit at Data Centre World Frankfurt 2023</title>
		<link>https://loadbanks.com/crestchic-loadbanks-to-exhibit-at-data-centre-world-frankfurt-2023/</link>
		
		<dc:creator><![CDATA[Crestchic]]></dc:creator>
		<pubDate>Fri, 28 Apr 2023 14:57:21 +0000</pubDate>
				<category><![CDATA[News]]></category>
		<category><![CDATA[data centre world]]></category>
		<category><![CDATA[datacentre]]></category>
		<category><![CDATA[dcw]]></category>
		<category><![CDATA[frankfurt]]></category>
		<guid isPermaLink="false">https://loadbanks.com/?p=66521</guid>

					<description><![CDATA[<p>Crestchic Loadbanks, the global leader in load testing equipment, is excited to announce their participation in the upcoming Data Centre World Frankfurt 2023, the largest gathering of data centre professionals in Central Europe &#38; the DACH region. Taking place on May 10 and 11, 2023, the event will provide an opportunity for Crestchic to showcase [&#8230;]</p>
<p>The post <a href="https://loadbanks.com/crestchic-loadbanks-to-exhibit-at-data-centre-world-frankfurt-2023/">Crestchic Loadbanks to exhibit at Data Centre World Frankfurt 2023</a> appeared first on <a href="https://loadbanks.com">Crestchic leading manufacturer of load banks</a>.</p>
]]></description>
										<content:encoded><![CDATA[<p><span style="font-weight: 400;">Crestchic Loadbanks, the global leader in load testing equipment, is excited to announce their participation in the upcoming Data Centre World Frankfurt 2023, the largest gathering of data centre professionals in Central Europe &amp; the DACH region.</span></p>
<p><span style="font-weight: 400;">Taking place on May 10 and 11, 2023, the event will provide an opportunity for Crestchic to showcase their latest range of products, including the following:</span></p>
<ul>
<li style="font-weight: 400;" aria-level="1"><a href="https://loadbanks.com/ac-resistive-loadbanks/"><span style="font-weight: 400;">Resistive-only load banks</span></a><span style="font-weight: 400;"> typically up to 300kW for heat load testing</span></li>
<li style="font-weight: 400;" aria-level="1"><a href="https://loadbanks.com/datacentre-server-emulator-loadbanks/"><span style="font-weight: 400;">Rack mounted server emulators</span></a><span style="font-weight: 400;"> for heat load- testing</span></li>
<li style="font-weight: 400;" aria-level="1"><span style="font-weight: 400;">Capacitive load banks to test with the leading power factor often associated with servers</span></li>
<li style="font-weight: 400;" aria-level="1"><span style="font-weight: 400;">Large multi-megawatt, </span><a href="https://loadbanks.com/ac-medium-voltage-loadbanks/"><span style="font-weight: 400;">medium voltage load bank packages</span></a><span style="font-weight: 400;"> to test and synchronise multigenset systems on a common bus with a lagging power factor</span></li>
<li style="font-weight: 400;" aria-level="1"><a href="https://loadbanks.com/dc-direct-current-loadbanks/"><span style="font-weight: 400;">DC load banks</span></a><span style="font-weight: 400;"> to test UPS systems for close battery analysis and discharge performance</span></li>
<li style="font-weight: 400;" aria-level="1"><a href="https://loadbanks.com/ac-resistive-reactive-loadbanks/"><span style="font-weight: 400;">Resistive-reactive load banks</span></a><span style="font-weight: 400;"> for testing the whole system operation in an emergency change-over scenario</span></li>
</ul>
<p><span style="font-weight: 400;">With over 30 years of experience in the load testing industry, Crestchic has built a strong reputation for providing high-quality and reliable load testing solutions across the world. Their range of load testing equipment has been used across various industries, including data centres, telecommunications, and military sectors.</span></p>
<p><span style="font-weight: 400;">Speaking on the upcoming event, </span><span style="font-weight: 400;">Heiko Thoene-Schaub, Sales Manager at </span><span style="font-weight: 400;">Crestchic Loadbanks’ GmbH, said, “We are delighted to participate in the Data Centre World Frankfurt 2023 event. This is an excellent opportunity for us to showcase our latest range of load testing solutions to industry professionals and highlight how load bank testing can help to guarantee uptime in the event of a power outage.”</span></p>
<p><span style="font-weight: 400;">With over 10,000 attendees expected to attend the event, Crestchic aims to connect with industry leaders and showcase their commitment to providing reliable load testing solutions for businesses across the world. Representatives from Crestchic will be available to answer questions on stand E070. </span></p>
<p><span style="font-weight: 400;">More information about Data Centre World Frankfurt can be found at </span><a href="https://www.datacentreworld.de/"><span style="font-weight: 400;">https://www.datacentreworld.de/</span></a><span style="font-weight: 400;"> </span></p>
<p>&nbsp;</p>
<p>The post <a href="https://loadbanks.com/crestchic-loadbanks-to-exhibit-at-data-centre-world-frankfurt-2023/">Crestchic Loadbanks to exhibit at Data Centre World Frankfurt 2023</a> appeared first on <a href="https://loadbanks.com">Crestchic leading manufacturer of load banks</a>.</p>
]]></content:encoded>
					
		
		
		<post-id xmlns="com-wordpress:feed-additions:1">66521</post-id>	</item>
		<item>
		<title>Crestchic Texas &#8211; excellent service on load bank orders for all customers, big and small</title>
		<link>https://loadbanks.com/crestchic-texas-excellent-service-on-load-bank-orders-for-all-customers-big-and-small/</link>
		
		<dc:creator><![CDATA[Crestchic]]></dc:creator>
		<pubDate>Wed, 12 Apr 2023 15:14:16 +0000</pubDate>
				<category><![CDATA[News]]></category>
		<category><![CDATA[army]]></category>
		<category><![CDATA[crestchic texas]]></category>
		<category><![CDATA[datacenter]]></category>
		<category><![CDATA[datacentre]]></category>
		<category><![CDATA[load bank]]></category>
		<category><![CDATA[loadbanks]]></category>
		<category><![CDATA[texas]]></category>
		<category><![CDATA[usa]]></category>
		<category><![CDATA[veteran power services]]></category>
		<guid isPermaLink="false">https://loadbanks.com/?p=66461</guid>

					<description><![CDATA[<p>Arkansas-based generator maintenance business, Veteran Power Solutions, has appointed Crestchic in Texas as its primary load bank supplier, citing cost savings, delivery speed, and customer services as the main drivers. Generator testing specialists Despite being a relatively new business, the owner of Veteran Power Solutions, John Hill, has amassed more than 20 years of experience [&#8230;]</p>
<p>The post <a href="https://loadbanks.com/crestchic-texas-excellent-service-on-load-bank-orders-for-all-customers-big-and-small/">Crestchic Texas &#8211; excellent service on load bank orders for all customers, big and small</a> appeared first on <a href="https://loadbanks.com">Crestchic leading manufacturer of load banks</a>.</p>
]]></description>
										<content:encoded><![CDATA[<p><strong>Arkansas-based generator maintenance business, Veteran Power Solutions, has appointed Crestchic in Texas as its primary load bank supplier, citing cost savings, delivery speed, and customer services as the main drivers. </strong></p>
<p><strong>Generator testing specialists </strong></p>
<p>Despite being a relatively new business, the owner of Veteran Power Solutions, John Hill, has amassed more than 20 years of experience in generator maintenance. The company offers generator and transfer switch maintenance across a range of makes and models, including Generac, Cat, Cummins, Kohler, Taylor, and Briggs and Stratton. A key part of the servicing offered by the company is generator testing, which uses a load bank to apply a dummy load in order to fully test the integrity of the generator and ensure it will work in the event of a power failure. The company also offers regular load testing regimes to ensure that backup power systems meet NFPA-110 standards.</p>
<p><strong>Why load banks are key to success </strong></p>
<p>John explains, “Load bank testing is a key part of any generator maintenance strategy &#8211; it is the only way to fully test how a generator will respond under a full load, including testing the fuel, engine, cooling and switchgear are working as they should. It is critical to my business that I have a supplier that can provide the load bank technology I need to test gensets quickly, reliably, and at a reasonable cost.”</p>
<p>To fulfill this need, Veteran Power Solutions turned to Crestchic. With over 40 years of experience in the supply of load banks and power testing equipment, Crestchic is a global business that has facilities across the US. The company has the expertise and capability to develop tailor-made testing solutions, from standard-size resistive and reactive load banks or custom-designed and built load banks of any size at any voltage and frequency.</p>
<p><strong>Good customer service for all </strong></p>
<p>Crucially, Crestchic offers the same level of service whether the company is a small first-time customer, or <a href="https://loadbanks.com/unbeatable-turnaround-time-ensures-same-day-supply-of-17-load-banks-in-texas/">a major player in the data centre industry looking for a whole fleet. </a></p>
<p>John continues, “I went with Crestchic because they were easy to do business with. I’m a small, veteran-owned business, and I know that Crestchic deals with some of the big players, including hyperscale datacentres that require multiple units. I first reached out for a proposal to rent a 100KW load bank for a few months and was really impressed with their response time, cost savings, and the level of support they provided.”</p>
<p>Based out of Texas, the Crestchic team prides itself on providing excellent customer service and a fast turnaround. As load bank rental specialists, the team knows that the equipment is used to run mission-critical testing, often at short notice. The team has a fleet of load banks available for hire. Each unit undergoes full testing, maintenance, and cleaning when it is returned to the depot, ensuring that it is ready for quick shipping if the need arises.</p>
<p>John concludes, “As well as saving me money versus my previous supplier, the Crestchic team made sure my load bank was delivered quickly so I did not lose any business. I’ll be returning to Crestchic for any future load bank requirements and will recommend that others give them a call.”</p>
<p>The post <a href="https://loadbanks.com/crestchic-texas-excellent-service-on-load-bank-orders-for-all-customers-big-and-small/">Crestchic Texas &#8211; excellent service on load bank orders for all customers, big and small</a> appeared first on <a href="https://loadbanks.com">Crestchic leading manufacturer of load banks</a>.</p>
]]></content:encoded>
					
		
		
		<post-id xmlns="com-wordpress:feed-additions:1">66461</post-id>	</item>
		<item>
		<title>Backup power using renewable energy? LINDA has the answer.</title>
		<link>https://loadbanks.com/backup-power-using-renewable-energy-linda-has-the-answer/</link>
		
		<dc:creator><![CDATA[Crestchic]]></dc:creator>
		<pubDate>Wed, 29 Mar 2023 14:53:33 +0000</pubDate>
				<category><![CDATA[News]]></category>
		<category><![CDATA[backup power]]></category>
		<category><![CDATA[datacentre]]></category>
		<category><![CDATA[emergency power]]></category>
		<category><![CDATA[germany]]></category>
		<category><![CDATA[linda]]></category>
		<category><![CDATA[load banks]]></category>
		<category><![CDATA[loadbanks]]></category>
		<guid isPermaLink="false">https://loadbanks.com/?p=66414</guid>

					<description><![CDATA[<p>Backup power: Until now, renewable energy plants in Germany have not been set up for emergency power supply in the event of a power outage. That is about to change, thanks to the award-winning LINDA research project &#8211; and Crestchic’s load bank technology is a critical part of the solution.  What is the LINDA project?  [&#8230;]</p>
<p>The post <a href="https://loadbanks.com/backup-power-using-renewable-energy-linda-has-the-answer/">Backup power using renewable energy? LINDA has the answer.</a> appeared first on <a href="https://loadbanks.com">Crestchic leading manufacturer of load banks</a>.</p>
]]></description>
										<content:encoded><![CDATA[<p><span style="font-weight: 400;">Backup power: Until now, renewable energy plants in Germany have not been set up for emergency power supply in the event of a power outage. That is about to change, thanks to the award-winning </span><span style="font-weight: 400;">LINDA research project &#8211; and Crestchic’s load bank technology is a critical part of the solution. </span></p>
<h2><span style="font-weight: 400;">What is the LINDA project? </span></h2>
<p><span style="font-weight: 400;">Funded by the Federal Ministry for Economic Affairs and Energy, the project looks at how renewable energy plants could supply power to a local “island” grid in a decentralised way in the event of a power failure. The project &#8211; Local Island Grid Supply and Accelerated Grid Reconstruction with Decentralised Generation Plants in the Event of Large-scale Power Outages (or the more simple “LINDA” to those in the know) &#8211; seeks to explore, test and implement ways of making power generation systems use renewable energy sources for emergency power supplies. </span></p>
<p><span style="font-weight: 400;">In 2018, phase one of the project &#8211; which involved partners from across academia and industry, including the Augsburg University of Applied Sciences, the Technical University of Munich, LEW Verteilnetz and LEW Wasserkraft, and KIMA automation &#8211; won the ISGAN Award (International Smart Grid Action Network) and the Bavarian Energy Prize.</span></p>
<p><span style="font-weight: 400;">The project included the development of</span><span style="font-weight: 400;"> a new emergency generator that successfully integrated renewable decentralised power generation systems, including photovoltaic systems, hydroelectric power plants and a biogas plant, into an independent island grid. In the event of a power failure, the system was designed to supply a local grid with electricity power from existing renewable energy sources. </span></p>
<h2><span style="font-weight: 400;">Emergency power &#8211; limitations of the current approach </span></h2>
<p><span style="font-weight: 400;">Historically, emergency power generators have been operated in such a way that power failures can result in a temporary lapse in supply while the generator kicks in. As well as causing momentary outages and fluctuations in supply, these backups are usually supplied by diesel generators. With the new approach, the system is designed to provide a continuous supply in the event of a power failure &#8211; using power from multiple decentralised systems and, crucially, favouring renewables as a backup power source. </span></p>
<p><span style="font-weight: 400;">In pilots of the system, LINDA was able to guarantee the uninterrupted power supply of households in the test communities. This was done without costly retrofitting of the current systems, providing an important building block for the energy transition and improved security of supply.</span></p>
<h2><span style="font-weight: 400;">LINDA 2.0 &#8211; automating backup power </span></h2>
<p><span style="font-weight: 400;">In the second phase of the project &#8211; LINDA 2.0 &#8211; the research team is developing a supply concept with battery storage and a diesel generator to provide an additional backup power supply. As well as providing a backup, the system is being designed to automatically balance the fluctuating power generation from decentralised systems and the energy load itself. As well as ensuring a stable and secure power supply without interruptions, </span><span style="font-weight: 400;">the automation will enable the system to shift into emergency mode remotely, without the need for staff to be on site. </span></p>
<h2><span style="font-weight: 400;"><img data-recalc-dims="1" decoding="async" class="alignleft size-medium wp-image-66416" src="https://i0.wp.com/loadbanks.com/wp-content/uploads/2023/03/Linda01-1.jpg?resize=300%2C198&#038;ssl=1" alt="" width="300" height="198" />Bespoke load bank solution helps to balance frequency </span></h2>
<p><span style="font-weight: 400;">In order to automate the system, AVS &#8211; a German blackout management specialist that provides generators and grid stabilisation systems to a range of industries &#8211; worked with the team at Crestchic Loadbanks to create a fully automatic hybrid frequency-controlled power control for generators up to 1300 kVA. </span></p>
<p><span style="font-weight: 400;">Dubbed</span><i><span style="font-weight: 400;"> AVS Greenomic</span></i><span style="font-weight: 400;">, the solution allows the system to prioritise drawing on renewable energy (e.g. CHP, wind power or photovoltaic systems) in order to provide backup power in a blackout scenario &#8211; allowing Diesel fuel consumption to be reduced by up to 80%. </span><span style="font-weight: 400;">The load bank itself provides a stability of voltage and frequency when switching between different power sources, and maintains a constant 20% load on the Generator. </span><span style="font-weight: 400;">Any oversupply of energy is also consumed in a controlled manner, helping to balance the power generation system and smooth out any frequency inbalances.</span></p>
<p><span style="font-weight: 400;">Mike Derbyshire, European </span><span style="font-weight: 400;">Area Sales Manager at Crestchic, explains, “</span><span style="font-weight: 400;">We’ve worked with AVS for a number of years, so were delighted to collaborate with them on a bespoke solution that would meet the requirements of the LINDA project. Our standard load banks and controllers were adapted to allow AVS to add their own control system, and we added additional fuse protection, an interface between the load bank and the Greenomic assembly and the power connections themselves &#8211; all of which enables the system to balance the frequency and ensure and reliable and stable supply. It’s a high-profile project and we’re pleased to have been able to use our technical experience to support and enable the project goals.” </span></p>
<p><span style="font-weight: 400;">To find out more about the role of load banks in backup power systems, get in touch here: </span><a href="https://loadbanks.com/contact-us/"><span style="font-weight: 400;">Contact Us.</span></a></p>
<p>For our German office, visit: <a href="https://crestchic.de">Crestchic Germany.</a></p>
<p>&nbsp;</p>
<p>The post <a href="https://loadbanks.com/backup-power-using-renewable-energy-linda-has-the-answer/">Backup power using renewable energy? LINDA has the answer.</a> appeared first on <a href="https://loadbanks.com">Crestchic leading manufacturer of load banks</a>.</p>
]]></content:encoded>
					
		
		
		<post-id xmlns="com-wordpress:feed-additions:1">66414</post-id>	</item>
		<item>
		<title>INCREASING DATA CENTRE POWER CONSUMPTION IN AN ENERGY CRISIS</title>
		<link>https://loadbanks.com/increasing-data-centre-power-consumption-in-an-energy-crisis/</link>
		
		<dc:creator><![CDATA[Crestchic]]></dc:creator>
		<pubDate>Mon, 20 Feb 2023 16:10:05 +0000</pubDate>
				<category><![CDATA[News]]></category>
		<category><![CDATA[datacentre]]></category>
		<category><![CDATA[energy crisis]]></category>
		<category><![CDATA[load banks]]></category>
		<guid isPermaLink="false">https://loadbanks.com/?p=66418</guid>

					<description><![CDATA[<p>Energy Crisis: The role of generator maintenance in ensuring power resilience The global energy crisis is affecting the profitability and operational efficiency of businesses from all sectors, but for data centres and their inherently higher power consumption levels, the impacts are polarised. For the data centre market to achieve its projected growth trajectory, it must [&#8230;]</p>
<p>The post <a href="https://loadbanks.com/increasing-data-centre-power-consumption-in-an-energy-crisis/">INCREASING DATA CENTRE POWER CONSUMPTION IN AN ENERGY CRISIS</a> appeared first on <a href="https://loadbanks.com">Crestchic leading manufacturer of load banks</a>.</p>
]]></description>
										<content:encoded><![CDATA[<p><strong>Energy Crisis: The role of generator maintenance in ensuring power resilience </strong></p>
<p>The global energy crisis is affecting the profitability and operational efficiency of businesses from all sectors, but for data centres and their inherently higher power consumption levels, the impacts are polarised.</p>
<p>For the data centre market to achieve its projected growth trajectory, it must continue to adopt power-intensive next-generation IT technologies. And, it must do that in the face of an unstable grid, potential planned blackouts and suggested power rationing. That means rigorous investment in backup power and generator maintenance, at a time when energy bills are consuming investable profit.</p>
<p>Paul Brickman, Commercial Director, for Crestchic Loadbanks, explores the often-overlooked necessity of load bank testing in securing data centre power in an energy crisis.</p>
<p>Hiked power prices as a result of Russia’s fuel sanctions, and the threat of planned blackouts or power rationing to better manage an unstable grid, are forcing data centres to redistribute investment away from key business functions like training and recruitment, and towards improving energy efficiency and securing power resilience.</p>
<p>The current geopolitical challenges and their far-reaching implications are recognised in the 2023 Uptime Institute Report – <a href="https://uptimeinstitute.com/resources/research-and-reports">Five Data Center Predictions for 2023</a> – in which the authors acknowledge that the Russian fuel sanctions, along with technological challenges “will make the planning of data centre development and operation more difficult.”</p>
<p><strong>Powering next-generation data centres</strong></p>
<p>According to the Uptime Institute, IT hardware has been fairly standard in terms of its draw on mainstream server capacity for a few decades now, creating technical stability and relatively constant power and cooling requirement.</p>
<p>This has enabled data centre designers to accommodate several IT refreshes without major upgrades to server technology and the associated hike in power consumption that would come with it. Essentially offering the latest technologies, without an increase in energy requirement.</p>
<p>This grace period is now over. Power requirements for next-generation IT hardware are far higher, rack power density is increasing, and “hotter” processors are putting pressure on the performance parameters of existing infrastructure.</p>
<p>This rapid rise in IT power density means server power consumption is on a steep climb, creating a need for more power, at a time when the grid is unstable, and energy prices are at their highest in decades.</p>
<p>Extreme-density racks are now commonplace in technical computing too, as well as high-performance analytics and artificial intelligence training. If data centre operators want to successfully penetrate these niche markets, they will need to foot the heightened energy bill and maintain a robust power resilience regime until the situation stabilises.</p>
<p><strong>Data centres take action</strong></p>
<p>Demand for next-generation IT technologies will not slow. As a result, data centres are forging ahead with the essential upgrades required to UPS, batteries, switchgear and generators to accommodate increased power density.</p>
<p>This is a risk. With an unstable grid and planned blackouts still on the agenda for many governments, upgrades will need to be bolstered with a watertight energy resilience plan to protect against power fluctuations and total outages.</p>
<p><strong>The importance of a power resilience strategy in an energy crisis</strong></p>
<p>According to research from the Ponemon Institute, in its third “Cost of Data Center Outages” report, the total cost of downtime has continued to rise over the last six years – rising a staggering 38% to $740,357 per incident. That equates to nearly $9,000 per minute – a figure that many data centres will have to swallow if the grid becomes too unstable to sustain their increasing power consumption.</p>
<p>Many data centres will already have a robust generator testing and maintenance regime in place, but the use of load banks is often overlooked, especially when budgets are stretched. At a time when power outages are more likely, load bank testing should play an integral role in a data centre’s energy resilience strategy and it would be prudent to evaluate your strategy in line with the current landscape to ensure it is robust enough. With this in mind, what would be considered best practice for testing a backup power system?</p>
<p><strong>Best practice load bank testing in times of crisis</strong></p>
<p>Ideally, as a minimum all generators should be tested annually for real-world emergency conditions using a resistive-reactive 0.8pf load bank. Best practice dictates that all gensets (where there are multiple) should be run in a synchronised state, ideally for 8 hours but for a minimum of 3.</p>
<p>Where a resistive-only load bank is used, testing should be increased to 2-4 times per year at 3 hours per test. In carrying out this testing and maintenance, fuel, exhaust and cooling systems are effectively tested and system issues can be uncovered in a safe, controlled manner without the cost of major failure or unplanned downtime. The alternator is not thoroughly tested though, with a resistive-only test and therefore a resistive-reactive test would always be recommended.</p>
<p>It may be advisable to test more frequently during times of crisis for added peace of mind.</p>
<p><strong>Why is resistive-reactive the best approach? </strong></p>
<p>Capable of testing both resistive and reactive loads, this type of load bank provides a much clearer picture of how well an entire system will withstand changes in load patterns while experiencing the level of power that would typically be encountered under real operational conditions.</p>
<p>Furthermore, the inductive loads used in resistive/reactive testing will show how a system will cope with a voltage drop in its regulator. This is particularly important in any application which requires generators to be operated in parallel (prevalent in larger business infrastructures such as hyperscale data centres) where a problem with one generator could prevent other system generators from working properly or even failing to operate entirely. This is something which is simply not achievable with resistive-only testing.</p>
<p><strong>Navigating growth when power is scarce </strong></p>
<p>No matter the geopolitical challenges and the effect it is having on power availability, data centres have no choice but to grow.</p>
<p>Demand will not cease, and power-intensive next-generation technologies are unavoidable. Ensuring power resilience via a watertight backup power supply and a robust testing and maintenance regime will enable data centre designers and operators to grow, safe in the knowledge that, should planned blackouts, power rationing or grid fluctuations happen, the power will always remain on.</p>
<p>For support with improving your load bank testing regime, search Crestchic Load Banks online.</p>
<p>The post <a href="https://loadbanks.com/increasing-data-centre-power-consumption-in-an-energy-crisis/">INCREASING DATA CENTRE POWER CONSUMPTION IN AN ENERGY CRISIS</a> appeared first on <a href="https://loadbanks.com">Crestchic leading manufacturer of load banks</a>.</p>
]]></content:encoded>
					
		
		
		<post-id xmlns="com-wordpress:feed-additions:1">66418</post-id>	</item>
	</channel>
</rss>
