These images were captured by Benjamin Velasco during a 10MW generator test in Frankfurt, highlighting the scale and complexity of validating high-power systems. The test configuration included three 3.3MVA loadbanks, one 6.0MVA loadbank, and two 6.3MVA transformers, working together to accurately apply and manage the load throughout the process. From idle to full load, the system was closely monitored to ensure stable performance, reliability, and compliance under demanding conditions.