Load Banks In The Healthcare Sector
Testing solutions from the world’s leading load bank manufacturer
Load banks are used to test the effectiveness of standby systems in a variety of situations:

Key Factors
-
Running a generator on full load helps to avoid “wet stacking” where the engine’s performance is compromised by unburnt fuel, lubricating oil and condensation caused by a light load on the alternator and low engine temperature and exhaust gasses.
-
Using a load bank to simulate actual demand will prove whether the controls and switch panels work as expected under real conditions.
-
Regular “black start” testing will ensure that in the event of a power failure the standby system is capable of taking on the full load in 10 to 15 seconds of the generator starting.
-
Frequent operation of the automatic transfer switch (ATS), which regulates the sequence of large load application and shedding, for example lifts, HVAC motors and compressors, will facilitate its long term proper operation.
-
Regular discharge of the UPS using a DC load bank will ensure it can be maintained in its fully charged state for as long as possible.
-
Load testing of the total demand will ensure that any changes to the power profile of the building or process can be monitored – such as a change or upgrade in the A/C or heating, lifts or other machinery or a change in the generator itself (e.g. fuel, air flow, acoustics or change in the exhaust).


Another step up transformer rolls off the production line
Crestchic has just manufactured another brand new step up transformer, ready to go into the company's active hire fleet. The unit is housed in a 10ft CSC container and features 3.8MVA Step up transformer, 400v up to a max of 17.7kV multi-tap setup with MV switchgear...

WHY USE A LOAD BANK?
Load banks are primarily used for testing electrical power output on diesel generators, gas turbines and UPS systems whilst carrying out commissioning and maintenance work.
The load banks are used for simulating real electrical loads enabling essential setup and commissioning which ensures that all electrical and control parameters are met prior to power generation/back up equipment being energized on line.