CRESTCHIC SHIPBUILDING CASE STUDY

CRESTCHIC SHIPBUILDING CASE STUDY

SHIPBUILDING INDUSTRY: CRESTCHIC COMPLETES LOAD BANK UPGRADE FOR ONE OF THE WORLDS LARGEST SHIPBUILDING GROUPS A global multinational shipbuilder and cruise ship designer appointed Crestchic Loadbanks to deliver a significant programme of upgrades to four 5.5 MW load...
Crestchic Loadbanks USA to exhibit at key Data Center Event

Crestchic Loadbanks USA to exhibit at key Data Center Event

Crestchic USA will be showcasing a range of load banks at the forthcoming Data Center World event in Texas.  The event, which takes place at Austin Convention Center, 8-11 May,  is billed as the leading digital infrastructure event designed for data center...
Backup power using renewable energy? LINDA has the answer.

Backup power using renewable energy? LINDA has the answer.

Backup power: Until now, renewable energy plants in Germany have not been set up for emergency power supply in the event of a power outage. That is about to change, thanks to the award-winning LINDA research project – and Crestchic’s load bank technology is a...