Integrated Systems Testing: Modern data centres support crucial infrastructure for businesses, governments, and institutions. As such, uninterrupted service is essential. Integrated Systems Tests (ISTs) are critical for ensuring the reliability, resilience, and continuity of operations in an environment where even a few seconds of downtime can have significant consequences.
Meticulously designed, data centres must be able to store, process, and distribute vast amounts of data, 24 hours a day, 7 days a week. To meet this relentless demand for uninterrupted service data centres combine advanced engineering, architecture, and cutting-edge technology.
Using comprehensive testing and evaluation, IST ensures that all critical systems work seamlessly together. These tests are conducted after individual systems (like power, cooling, network, and security) have been installed and tested independently.
Why are Integrated Systems Tests important?
Tests integrate all critical equipment and systems, conducting rigorous assessments to evaluate and verify functionality, interoperability, and response to simulated failure scenarios. By testing power distribution systems and cooling systems, commissioning managers can verify that systems and components meet specified performance criteria.
This includes:
- Verify interoperability: Ensure that systems like power distribution systems, Uninterruptible Power Supplies (UPS), generators, cooling systems, and fire suppression systems work in harmony.
- Assess resilience and reduce risk: Testing allows operators to simulate events such as power outages, equipment failures, and cooling loss to verify that the data centre can continue to operate under these conditions. The tests can also check if backup power systems activate as intended to prevent downtime.
- Safety and compliance: Testing can help to validate that emergency protocols are effective and meet industry regulations, standards and best practices.
- Performance of electrical systems: Testing allows operators to confirm that the data centre can handle maximum load requirements and ensure that systems like power and cooling can support this load.
What do IST tests cover?
The Uptime Institute states: “Rigorous, comprehensive commissioning reduces initial failure rates, ensures that the data centre functions as designed, and verifies facility operations capabilities—setting up Operations for success.”
Generally, five levels of testing form the overall process of commissioning a data centre:
- Level 1: Factory Testing,
- Level 2: Site acceptance inspection
- Level 3: Pre-functional testing
- Level 4: Functional Testing,
- Level 5: Integrated System Testing
The below table, from the Uptime Institute, outlines what is covered in each step:
Level five testing, or integrated systems testing, covers several key areas to ensure reliable and resilient operations. Power systems, including backup generators, UPS systems, power distribution units, and batteries, are tested to confirm they can maintain uninterrupted power.
Cooling systems are verified to ensure they keep temperatures stable even under heavy loads – a vital step for server rooms that exude huge amounts of heat under normal operation. Tests also cover networking infrastructure and fire suppression and security systems. Together, these tests provide a comprehensive view of the data centre’s readiness to handle real-world demands and potential emergencies.
What are the benefits of running an IST?
Prevent unplanned downtime: Modern data centres must operate 24/7. ISTs can identify weaknesses that might lead to failures during normal operation.
Operational readiness: Ensures the data centre can meet strict Service Level Agreements (SLAs) with minimal risk of failure.
Improved efficiency: Helps to identify areas for operational optimisation, like load balancing in power or cooling systems.
In summary, ISTs are critical because they validate that systems have been designed and commissioned correctly to keep the environment stable, safe, and online—even under stress. This holistic testing approach is critical to minimising risk and maximising reliability in a setting where uptime is everything.
Find out how our 200kW data centre loadbank can help make IST tests more efficient and accurate. Speak to our team now.