![Load Banks – Day 1 of 5 – Key considerations when hiring a load bank](https://i0.wp.com/loadbanks.com/wp-content/uploads/2019/09/loadbanks-on-oil-rig_800x400.jpg?resize=800%2C400&ssl=1)
![Load Banks – Day 1 of 5 – Key considerations when hiring a load bank](https://i0.wp.com/loadbanks.com/wp-content/uploads/2019/09/loadbanks-on-oil-rig_800x400.jpg?resize=800%2C400&ssl=1)
![Crestchic welcomes new Technical Director to bolster production at UK site](https://i0.wp.com/loadbanks.com/wp-content/uploads/2022/01/jon-crestchic.png?resize=1080%2C675&ssl=1)
Crestchic welcomes new Technical Director to bolster production at UK site
Crestchic is pleased to announce the recent appointment of Jon Storer to the role of Technical Director. A chartered engineer with a wealth of experience, Jon will oversee and optimise the production, test and development facilities at the company’s site in Burton. ...![Steven Bacon welcomed at Crestchic USA as new Business Development Manager](https://i0.wp.com/loadbanks.com/wp-content/uploads/2021/09/Steven-Bacon.jpg?resize=496%2C500&ssl=1)
Steven Bacon welcomed at Crestchic USA as new Business Development Manager
As part of Crestchic’s expansion strategy in the USA, we have recruited Steven Bacon, an experienced sales professional with a power generation background, as our new Business Development Manager. Steven Bacon will undertake market positioning research and look to...![Crestchic expands its manufacturing footprint by 60% to meet increased demand](https://i0.wp.com/loadbanks.com/wp-content/uploads/2017/09/rental-office.jpg?resize=1080%2C608&ssl=1)
Crestchic expands its manufacturing footprint by 60% to meet increased demand
Crestchic Loadbanks, a UK headquartered manufacturer of load testing equipment, has announced plans to extend its factory, adding 60% to the current site footprint, along with an additional 30 jobs. Work is officially due to commence in August 2021, with an...![Load Bank Control: New control module GEMINI delivers data from MV supply](https://i0.wp.com/loadbanks.com/wp-content/uploads/2020/12/400kVA-MV-Instrumentation-pic.gif?resize=800%2C546&ssl=1)